Top Projects 2014: Project of the year award

IMG 7997

 

 

 

 

 

Jeanne and Peter Lougheed Performing Arts Centre

Project of the Year Winner & InstitutionalUnder $50 Million (tie)

By Joseph Caouette

 

Cost: $17.5 million

Location: Camrose, Alta.

Companies involved: BR2 Architecture, Clark Builders, Read Jones Christofferson, Smith + Anderson, Howell-Mayhew Engineering


Traditionally, audiences applaud the performer, not the theatre.

But the Jeanne and Peter Lougheed Performing Arts Centre is no traditional theatre. Boasting LED lightingpowered by an ingeniously designed solar arraythis stage is a model for the next generation of theatrical facilities and performance spaces. Not only has it tied for first place in the Top Projects AwardsInstitutionalUnder $50 Million category, it is also Alberta Construction Magazines choice for 2014 Project of the Year.

Top Projects 2014: Sustainability award

mosaic2

The Mosaic Centre for Conscious Community and Commerce

By Candice G. Ball

 

Cost: $11.6 million

Location: Edmonton

Companies involved: Manasc Isaac Architects, CHANDOS Construction Ltd., Fast + Epp, Clark Engineering, Manasc Isaac Consulting


The Mosaic Centre for Conscious Community and Commerce is more than a buildingits a green-building game changer. Alberta Construction Magazines choice for the Sustainability category is targeting net-zero energy useproducing as much energy as it consumes over the yeartargeting LEED Platinum standards, and striving to become the very first Living Building Challenge petal-certified building in Alberta.

2015 ACM MMM Button

2015 ACM Email Button

Login

Free account to gain access to ACM digital editions.